Wingate Electrical PLC approached us to provide WiFi for Phase 3A of the Battersea Power Station development.
This phase contained over 500 homes, a hotel, shops and restaurants and opened in 2021.
Our Solution
We provided the following:
- Full design and RF surveys to confirm the scope of works
- 58 Ruckus AC access points deployed across the 3 basement levels of Phase 3A to provide high-density coverage for the welfare work area and general coverage throughout
- Fibre backbone and Cat6 infrastructure to support WiFi network
- WiFi network to support snagging cloud-based software, network cabling and Cranesafe system
- VoIP calling
Additional Project Element
During the Covid-19 pandemic, Sir Robert McAlpine required a solution allowing architects in LA to check the completed mock-up apartment. We provided temporary internet and a WiFi network to support the virtual tours.