Main Contractor – Sir Robert McAlpine
Project Name – Battersea Power Station Phase 3A
Size – 39 Acres
Building Function – 500 homes, hotel, office space, retail
Completion – 2021

Solution Provided

  • Full Design and RF surveys completed for Client to confirm the scope of works 
  • 58 Ruckus AC access points to be deployed across the 3 basement levels of Phase 3A to provide high-density coverage for the welfare work area and general coverage throughout. 
  • Fibre backbone and Cat6 infrastructure to support WiFi network
  • WiFi network to support snagging cloud-based software, network calling and Cranesafe system.
  • VOIP calling